Refurbishment and Modernisation of a Listed School Building
The third element of the Academy project was the total refurbishment of an existing listed school building which including heating renewal, concrete repairs, and the installation of a lift for the disabled.
Music studios and rooms were segregated and sound proofed to allow recording.
The floor of the auditorium was brought back to the original condition.
All work was agreed with the local conservation officer.